Back to EU IVDR Overview
Annex XIII Part B & Articles 78–86

IVDR PMPF, PMS, PSUR & Vigilance

Performance evaluation does not end at CE marking. Post-Market Performance Follow-up (PMPF) is a proactive evidence engine designed to confirm or further characterize specific diagnostic performance questions throughout the commercial lifecycle.

The Closed-Loop Lifecycle Evidence Cycle

01

PMS / Complaint Data

02

Performance Signals

03

Risk Management Update

04

PMPF Execution

05

PER Annual Update

06

Claims / Labeling / CAPA

13 Key IVDR Post-Market Compliance Deliverables

PMS Plan and PMS Report compilation (Class A and Class B IVDs)
PSUR strategy and annual/biennial preparation (Class C and Class D IVDs per Article 81)
PMPF Plan linked directly to residual analytical and clinical uncertainties
PMPF Evaluation Report authoring and integration into the PER
Scientific validity surveillance & state-of-the-art literature monitoring
Analytical performance trend monitoring across commercial reagent lots
Real-world clinical performance monitoring and user feedback analysis
Complaint data evaluation, signal detection and statistical trending
Vigilance, serious incident assessment and Competent Authority reporting under Article 82
Field Safety Corrective Action (FSCA) and Field Safety Notice (FSN) support
ISO 14971 risk management file updates based on post-market findings
Summary of Safety & Performance (SSP) annual updates for Class C & D devices
Design and reagent change-control linkage to maintain certified status
Expert Differentiator

Targeted Post-Market Evidence, Not Generic Surveys

PMPF must not be generic customer satisfaction surveys. It should be specifically designed to confirm or further characterize the defined analytical and clinical performance questions that remain after initial CE marking.

PSUR Deadlines (Article 81)

Class D IVDs: Annual PSUR + EUDAMED upload + Notified Body review

Class C IVDs: Annual PSUR update

Class A & B IVDs: PMS Report updated as necessary

Draft Your IVDR PSUR

Ensure timely submission of compliant IVDR PSUR and PMPF evaluation reports.

Request PMPF Support

Maintain Defensible Real-World Evidence for Your IVD Portfolio

Our post-market scientists establish proactive PMPF and PMS frameworks that preserve CE mark certification.

Book a Consultation